Young Construction, Inc.

Home

About Us

Commercial

Residential

Contact Us

Recent Commercial Projects

 

PROJECT: THE CLUB AT COPPER RANCH
New Commercial Building - Hailey, Idaho

 

Description:

  • Living Architecture, which specializes in environmentally responsible projects, designed this health club with interior tennis facilities. The building is in the recently constructed Copper Ranch condominium development in the Woodside subdivision in Hailey.

Unique Process:

  • The building envelope is constructed with Durisol block. Durisol is a concrete form system made from recycled wood and concrete. The finishes on the interior are non-toxic and designed with the health of the user in mind. The project combines traditional building techniques with progressive ideas.


  • Approximately 20,000 of new construction in addition to the renovation of the existing indoors tennis facility.
  • Start date - August 2006
  • End date - August 2007

  • Estimated costs - $4,300,000
  • Actual costs - To Be Determined


 

 

PROJECT: POWER ENGINEERS
New Commercial Building - Hailey, Idaho

 

Description:

  • Two levels of new construction for offices and long-term data and file storage. Includes 6,000 sf of storage space protected by clean-agent fire suppression system. Robust electrical systems support extensive telecommunications systems. Includes provisions to support a potential third level to be added in the future.

Unique Process:

  • Construction of this office building occurred directly next to POWER Engineers’ existing office building and annex. Since there was a lot of foot traffic between the existing office building and annex, it was important to have a safe job-site without significantly disrupting the normal activities of POWER Engineers’ 300+ design professionals who work on-site.
  • Square footage - 27,000 on two levels

  • Start date - June 2005

  • End date - July 2006

  • Estimated costs - $2,997,690.60

  • Actual costs - $3,133,000
 

 

PROJECT: WOOD RIVER INSURANCE
New Office Construction/Remodel - Hailey, Idaho

 

Primary Objectives:

  • Three stories of new construction, plus remodel and tie-in to existing small office structure to build new commercial building on Hailey’s main street.

Unique Process:

  • Coordinated construction of new office space while business operated in existing space. Communication with Owner was vital to ensure a smooth transition of the business operations from the old to new space. Renovation work on the old space continued after Young Construction helped move the business to the new space.
  • Squarer footage - 4,000 sf new construction, plus 2,000 sf renovated space

  • Start date - August 1, 2001

  • End date - March 31, 2001

  • Estimated costs - $380,856.24

  • Actual costs - $373,117.24
 

 

PROJECT: 141 CITATION OFFICE BUILDING
Hailey, Idaho

 

Primary Objectives:

  • Two stories of new construction and tenant improvements for office and retail space.

Unique Process:

  • Helped design a project that offers maximum flexibility in tenant spaces. Design included up-to-date security/communications features at a cost that made the project viable.
  • Square footage - 13,000

  • Start date - June 1, 2004

  • End date - July 1, 2005

  • Estimated costs - $1,245,319

  • Actual costs - $1,245,875
 

 

PROJECT: ALPINE AQUATICS
Hailey, Idaho

 

Primary Objectives:

  • Two stores of new construction and tenant improvements for office and retail space.

Unique Process:

  • Assisted in designing a space that would allow the Owner to fully utilize the limited size of their lot for showroom, maintenance shop, yard displays and office space.
  • Square footage - 3,500

  • Start date - October 1, 2004

  • End date - June 1, 2004

  • Estimated costs - $317,807.03

  • Actual costs - $310,012.29
 

 

Home I About Us I Commercial I Residential I Contact Us

 

Young Construction, Inc.• P.O. Box 4936 • Ketchum, ID • 83340
Phone: 208.725.2001• Fax: 208.725.0400 • Email: dan@youngconstructioninc.com

 

Website powered by Network Solutions®